Stormwater Guidance DocumentCity of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 City of Pismo Beach - Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal PROGRAM MANAGEMENT ELEMENT E.6.a Legal Authority (a)Adopt Ordinance x Public Works The Draft Stormwater Quality Ordinance has been revised to include required legal authorities in the permit and will be considered by City Council for approval by September 2013. E.6.b Certification E.6.b Certification x Public Works The City will certify by it's Duly Authorized Representative as described in 40CFR122.22(b) that it will maintain legal authority implement and enforce the Permit. Certification to include (a) - (e) of this section. E.6.c Enforcement Measures and Tracking E.6.c Enforcement Response Plan x Public Works Develop and implement an Enforcement Response Plan (ERP) that will contain enforcement procedures for responding to violations and how to address repeat and continuing violations. ERP will include items (ii)(a) - (f). E.7 EDUCATION AND OUTREACH PROGRAM E.7.a Public Education and Outreach E.7.a The City will develop a "Clean Water" certification program for commercial businesses. Public Works E.7.a The City will continue to provide dog-mess bags (mutt-mitts) for public use. Public Works E.7.a The City will adopt a revised pet waste ordinance including enforcement provisions. Public Works E.7.a The City will hold presentation regarding stormwater for residents at the mobile home parks within the City. Public Works Implementation Year 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 1 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.7.a Public Education & Outreach - Select outreach option (if regional program - develop agreements) x Public Works Determine if the City will participate in a Regional Education and Outreach Program, fulfill the Education and Outreach requirements within our jusisdiction or do a combination of the two. (a)Public Education & Outreach - Develop/implement comprehensive education and outreach program. x Public Works Develop and implement a comprehensive storm water public education and outreach program designed to increase storm water knowledge and awareness in target audiences. (b)Public Education & Outreach - Conduct surveys 2x during permit term x x Public Works Conduct surveys twice during the permit term to gauge the public's level of awareness. (c)Develop and convey a specific stormwater messages. x x x x x Public Works Develop and convey a specific stormwater message that focuses on: local pollutants of concern, target audience, and regional water quality issues. (d)Develop & disseminate education materials to target audiences. x x x x x Public Works Develop and disseminate appropriate educational materials to target audiences. Educational materials will be disseminated in a variety of ways to reach different audiences. (e)Utilize public input in developing outreach program x x x x x Public Works Utilize public input in the development of the stormwater program. (f)Distribute the educational materials, using whichever methods and procedures determined appropriate during development of the PE strategy. x x x x Public Works Distribute the educational materials, using whichever methods and procedures determined appropriate during development of the PE strategy. (g)Provide water efficient/stormwater friendly landscaping information x x x x x Public Works Convey messages to explain the benefits of water-efficient and environmentally friendly landscaping using existing materials developed and distributed by the City's Water Conservation Program. (h)Promote reporting of illicit discharges x x x x x Public Works Develop and convey messages specific to reducing illicit discharges with information on how the public can report illicity discharges or water quality impacts through a central contact point using the City's stormwater web page and Stormwater Hotline. (i)Provide pesticide/fertilizer application information x x x x x Public Works Develop and convey messages specific to the proper application of pesticides, herbicides, and fertilizers. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 2 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (j)Provide materials to school children x x x x x Public Works Provide independent, parochial, and public schools with materials to effectively educate school-age children about stormwater runoff (k)Provide information on reducing discharges from organized car washes, mobile cleaning, pressure washing, and landscape irrigation. x x x x x Public Works Develop and convey messages specific to reducing discharges from organized car washes, mobile cleaning, pressure washing, and landscape irrigation. (l)Provide stormwater friendly education for organized car wash participants on reducing car x x x x Public Works Conduct stormwater friendly education for organized car wash participants. (m)Provide information on specific to Mobile cleaning and pressure wash businesses. x x x x Public Works Develop and and convey messages specific to mobile cleaning and pressure wash businesses. CBSM Implementation of a reduced set of Community Based Social Marketing (CBSM) requirements as described in the May 3, 2013 letter from the CCRWQCB. x x x x x Public Works Work with other local MS4s that participate in the Central Coast Partners for Water Quality to determine if a regional CBSM program will be developed or the City will comply individually with the May 3, 2013 letter from the CCRWQCB. (a)Implement a CBSM pilot project to address its highest priority water quality issue. x x x x Public Works Implement a CBSM pilot project to address its highest priority water quality issue. This can be related to a specific type of pollutant, pollutant source, community behavior, or watershed. The Pilot program shall include the following actions: 1)Research barriers to desired behaviors and benifits of desired behaviors. 2) Elicit commitment to implement desired behavior from target audience. 3) Provide prompts reminding target audience of desired behavior from target audience. 4) Use the concept of social norms/modeling of desired behavior. 5) Use education messages that are specific, easy to remember, from a credible source, and appropriate for the target audience. 6) Create incentives for the desired behavior. 7) Remove barriers to the desired behavior. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 3 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (b)Reporting Public Works Submit a summary of the past year CBSM activities and certify compliance with the May 3, 2013 letter. The summary must include: 1) Pilot program. 2) Research on barriers to desired behaviors and benefits of desired behaviors. 4) Implementation of social norms/modeling. Also the use of: 1) Commitments from target audiences to implement desired behaviors. 2) Prompts, 3) education messages, 4) incentives for desired behaviors, 5) Methods for removing barriers to behavior change. E.7.b Staff and Site Operator Training and Education b.1 Illicit discharge detection and and elimination training for City staff. x x x x x Public Works Illicit discharge detection and elimination staff training to include: what is an illicit discharge or connection, procedures for reporting and responding, follow-up training, training for new staff within 6 months of hire, information on reporting illicit discharges in all fleet vehicles. b.2.Construction outreach /training for City staff (a)Plan Reviewers and Permitting Staff x x x x x Public Works Plan Reviewers and Permitting Staff will be trained to be knowledgeable in Erosion & Sediment Control (ESC) Plans. Staff reviewing ESC plans will be certified as a QSD or work under the designated person on staff that possesses the QSD credential. (b)ESC/Stormwater Inspectors x x x x x Public Works ESC/Stormwater Inspectors shall be certified and maintain certification as a QSD or QSP. (c)Contract Plan Reveiwers x x x x The City shall ensure that contract plan reviewers, permitting staff, and Inspectors are trained if used. E.7.b.2.(b)Construction Site Operator Education (a)Provide information each year on training opportunities for construction Operators. x x x x Public Works Provide information each year on training opportunities for construction operators on BMP selection, installation, implementation, and maintenance as well as overall compliance, beginning in year 2. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 4 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (b)Develop outreach tools for educating construction operators. x x x x x Public Works Develop outreach tools aimed at educating construction operators on appropriate selection, installation, implementation, and maintenance of stormwater BMPs and program compliance. (c)Distribute outreach materials to construction operators disturbing land. x x x x Public Works Distribute appropriate outreach materials to all construction operators disturbing land within the City. (d)Update existing website to include information on BMPs. x x x x x Public Works Update the existing stormwater website, as necessary to include information on appropriate selection, installation, implementation, and maintenance of stormwater BMPs. E.7.b.3 Pollution Prevention and Good Housekeeping Staff Training (a)Biennial training for all staff implementing this program element. x x x Public Works Develop a biennial employee training program for appropriate employees involved in implementing pollution prevention and good housekeeeping practices as specified in E.11. Train all new hires within the first year of the hire date. (b) Biennual assessmet.x x Public Works Biennual assessmet of trained staff's knowledge. (c)Contractors performing O&M activities. x Public Works Require contractors hired to perform O&M activities shall be contractually required to comply with all stormwater BMPs, & SOPs. (d)Provide oversight of contractor activities. x x x Public Works Provide oversight of contractor activities to ensure BMPs, housekeeping practices, and SOPs followed. E.8 PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM E.8 Public Involvement and Participation Program E.8 Involve the public in the development and implementation of activities related to the program. x x x x x Public Works Involve the public in the development and implementation of activities related to the program. The program shall encourage volunteerism, public comment and input on policy, and activism in the community. (a)Public Involvement and participation strategy. x Public Works Develop public involvement strategy that establishes who is responsible for specific tasks and goals. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 5 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (b)Consider development of a citizen group. x x x x x Public Works The City will continue to attend the Partners for Water Quality which is open to the public and includes NGO members. (c)Create opportunities for citizens to participate. x x x x x Public Works Create opportunities for citizens to participate in the implementation of BMPs through sponsoring activities such as clean-ups, and educational activities. The City will continue to: Provide inforamtion and demonstrations at the City's Farmer's Market during Public Works Week, host the annual Creek Day and track the number of volunteers and amount of trash collected, and give the public a means to report unmarked publicly owned storm drain, as well as report possible illicit discharges. (d)Information on program x x x x x Public Works Ensure the public can find information on the stormwater program. (e)Actively engage in the Integrated Regional Water Management Plan (IRWMP) or watershed planning effort. x x x x x Public Works The City's Water Department ans City Engineer is involved in development of the revised IRWMP. E.9 ILLICIT DISCHARGE DETECTION AND ELIMINATION E.9.a Outfall Mapping E.9.a Create and maintain accurate outfall map including a site visit to each outfall x x x x x Public Works Create and maintain an up-to-date and accurate map of outfalls owned by the City. The map will include alphanumeric IDs, priortiy areas, water bodies recieving direct discharges, and the permit boundry. (a)Map to show all outfalls owned by the City. x Public Works The City's map shows all outfalls operated by the City. The drainage areas and land use(s) contributing to those outfalls will be added. Each outfall shall be mapped with GPS, alphanumeric identifier. Use photographs or electronic database to provide baseline information and track operation and maintenance needs over time. (b)Include location, name, of all water bodies receiving direct discharges from outfalls. x Public Works Location, name, of all water bodies receiving direct discharges from outfalls to be included on the map. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 6 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal ( c)Include priority areas x Public Works Include priority areas: older infrastructure, industrial, commercial, or mixed use areas, areas with a history of illicit discharges, illegal dumping, onsite sewage disposal systems, or that are likely to have illicit discharges. (d)Field sampling locations x Public Works Include field sampling locations if applicable. (e)Permit boundry x Public Works The current stormwater system includes the City limits which is our permit boundry. E.9.b Illicit Discharge Source/Facility Inventory (a)Create inventory of all industrial/commercial facilities and update annually x x x x Public Works Maintain an inventory of all industrial/commercial facilities/sources that could discharge pollutants. Update annually with minimum information listed in the section. (b)Types of facilities.x x x x Public Works The inventory must include: metal and other recycled material centers, vehicle repair, maintenace or cleaning, building trade central facilities or yards, corporation yards, building material retailers and storage and other facilities designated by the City or Regional Boards to have reasonable potential to contribute to polluted runoff. (c)Industrial General Permit.x x x x Public Works Determine if facilities have coverage under Industrial General Permit. Notify the RWQCB if not covered. (d)Update inventory annually.x x x x Public Works Update the inventory annually by contacts with commercial and industrial facility operators and owners, or through City databases such as business licenses, industrial waste inspections, and water/sewer connections. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 7 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (e)Develop and implement procedures to identify illicit discharges from priority areas. x Public Works Develop and implement procedures to proactively identify illicit discharges from priority areas shown on the stormwater map at least once over the length of the permit term. The procedures must include field observations, field screening, inspections, and other appropriate and effective survey methods. OR the City may establish a self- certification program in which authorized parties can demonstrate the prevention and elimination of illicit discharges at their facilities at least once during the permit term. E.9.c Field Sampling to Detect Illicit Discharges E.9.c The City will enhance its hazardous spill protection and procedures and training. Public Works E.9.c Sample ANY flowing outfalls identified in E.9.a x Public Works Sample all City owned outfalls that are flowing or ponding 72 hours after the last rain event during outfall mapping. E.9.c Annually sample priority area outfalls determined in E.9.a x x x x Public Works Conduct annual dry weather sampling of outfalls identified in priority areas on the stormwater map. (a)Conduct anuual sampling for parameters on Table 1. x x x x Public Works Test samples taken during the annual dry weather sampling for the following parameters to help determine the source of the discharge: Ammonia, color, conductivity, detergents, fluoride, hardness, pH, potassium and turbidity. (b)Determine if sample results exceed the action limits. x x x x Public Works Determine if sample results exceed the action levels listed on Table 2 for the parameters listed in (b). (c)Conduct follow up investigation within 72 hours if action levels exceeded x Public Works Conduct follow up investigations within 72 hours of becoming aware of the suspected illicit discharge to identify and locate the source of the illicit discharge. E.9.d Illicit Discharge Detection and Elimination Source Investigations and Corrective Actions 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 8 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.9.d The City will update Title 13 of the Municipal Code to refine the definition of illicit discharges and enforcement provisions Public Works E.9.d The City will develop an ordinance specifically addressing all constrcution site erosion and sediment control. Public Works E.9.d Develop written procedures for investigations and corrective actions x Public Works Develop written procedures for conducting investigation into the source of all non- stormwater discharges suspected to be illicit discharges. These procedures shall be part of the Illicit Discharge Detection and Elimination Program. E.9.d Conduct investigations within 72 hours. x x x x x Public Works Conduct follow up investigations with 48 - 72 hours to identify and locate the source of a suspected illicit discharge. If the investigation requires longer than 72 hours, the actions being taken to identify and locate the source of the suspected illicit discharge. (a)Non-stormwater discharges suspected of being sewage and/or significantly contaminated shall be investigated within 24 hours. x x x x x Public Works The City complies with the State Waste Discharge Requirements for Sanitary Sewer Systems. Any discharges suspected of being sewage are immediately responded to during working hours and by standby staff after hours. The City has procedures for receiving, responding to, and reporting sewer discharges. Any significantly contaminated discharges shall be investigated within 24 hours. (b)Prioritize investigations suspected to be sewage and/or significantly contaminated over other discharges. x x x x x Public Works Discharges suspected to be sewage and/or significantly contaminated will be prioritized over investigations of non-stormwater discharges. (c)Report any flows believed to be an immediate threat to human health or the environment to the Health Department. x x x x x Public Works The City has written procedures for reporting sewage spills to Health Dept. and the Office of Emergency Services. The City will immediately report any flows believed to be an immedieate threat to human health or the environment to the local Health Department. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 9 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (d)Determine and document the source of non-stormwater discharges. x x x x x Public Works Determine and document the source of non- stormwater discharges. If the source is authorized under the permit no further action is required. (e)Require the responsible party to conduct corrective actions. Conduct follow up investigation. x x x x x Public Works Immediately notify the responsible party of an illicit discharge and require corrective actions be taken within 72 hours to eliminate the discharge. Conduct follow-up investigation and field screening to verify discharge was eliminated. E.9.e Spill Response Plan E.9.e Develop and implement a spill response plan. x x x x x Public Works Develop and implement a spill response plan which includes Agency roles and responsibilities, procedures for responding to complaints, conducting investigations and clean up, and reporting. E.10 CONSTRUCTION SITE STORMWATER RUNOFF CONTROL PROGRAM E.10.a Construction Site Inventory x x x x x Public Works Create and maintain an inventory of all projects subject to the City's stormwater ordinance. Inventory shall inlcude: contact and site information, location in respect to all waterbodies, threat to water quality, current construction phase, inspection frequency, project start and completion dates, and date the erosion and sediment control plan approved by the City. E.10.b Construction Plan Review and Approval Procedures E.10.b Develop procedures.x Public Works Develop procedures to review and approve relevant construction plan documents. (a)Require the submittal of an Erosion and Sediment Control Plan (ESCP) for City approval prior to issuing a grading or building permit. x x x x x Public Works Require the submittal of a site-specific Erosion and Sediment Control Plan (ESCP). The City must review and written approval prior to issuing a grading or building permit. (b)Require ESCP include rationale for selecting BMPs. x x x x x Public Works Require the ESCP include rationale for selecting BMPs, including supporting soil loss calculations, if necessary. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 10 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (c)Require ESCPs list all applicable permits and submit evidence that permits have been obtained prior to soil disturbing activities. x x x x x Public Works Require ESCPs list all applicable permits directly associated with the grading activity and include a condition of the the grading permit that evidence will be submitted to the City that permits have been obtained prior to soil disturbing activities authorized by the grading permit. (d)Develop a checklist or similar process to review ESCPs. x x x x x Public Works Conduct and document the review of each ESCP using a checklist or similar process. E.10.c Construction Site Inspection and Enforcement E.10.c The City will inform the community regarding contruction site runoff problems and report action taken to address the issues. E.10.c Construction Site Inspection and Enforcement. x x x x x Public Works Implement procedures to verify compliance with the City's Water Quality Ordinance. Inspections to be conducted at priority sites prior to land disturbances (during the rainy season), during active construction and following active construction. Require all temporary ESC measures that are no longer needed have been removed. E.11 Pollution Prevention/Good Housekeeping for Permittee Operations Program E.11 The City will continue its existing street sweeping program. Public Works E.11 The City will provide opportunities for the proper disposal of trash and hazardous waste. Public Works E.11 The City will continue to provide dog-mess bags (mutt-mitts) for public use. Public Works E.11 The City will continue to place and maintain dome lids on trash receptacles on the pier and beach. Public Works E.11 The City will continue to contract to provide Hwy 101 on and off ramp trash pick up once a month. Public Works 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 11 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.11 The City will maintain the installation of a drain inlet filter on Main Street near the beach. E.11 The City will continue to emply Acheivement House to provide trash pick up services by hand throughout the City. Public Works E.11.a Inventory of Permittee-Owned and Operated Facilities E.11.a Develop and maintain an inventory of City owned or operated facilities. x x x x Public Works Develop and maintain an inventory of City owned or operated facilities that are a threat to water quality. E.11.b Map of Permittee-Owned or Operated Facilities E.11.b Submit a map of inventoried City- owned or operated facilities x Public Works Submit a map of the City showing all City- owned facilities inventoried in E.11.a. Include for each site: stormwater system, receiveing waters which the facilities drain to, manager of each facility and contact information. E.11.c Facility Assessment E.11.c Conduct Facility Assessments x x x x Public Works Conduct comprehensive annual assessments at all facilities inventoried in E.11.a. and identify pollutant hotspots. (a)Identification of hotspots.x x x x Public Works Based on the annual assessment, identify facilities with a high potential to generate stormwater and non-stormwater pollutants as pollutant hotspots and assign them high priority. Hotspots shall include at a minimum maintenance yards, and any other facilities at which chemicals or othre materials have ahigh potential to be discharges in storm water. (b)Documentation of the comprehensive assessment. x x x x Public Works Document comprehensive assessment procedures and results. E.11.d Stormwater Pollution Prevention Plans (SWPPPs). 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 12 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.11.d Develop and implement SWPPPs for hotspot facilities. x x Public Works Develop and implement site-specific SWPPPs for hotspot facilities that do not have existing Hazardous Materials Plan, Spill Prevention Plan or other equivalent document. SWPPPs should include purpose of document, site map with drainage identified, significant materials handled and stored that are exposed to stormwater, potential pollutant sources, facility BMPs, Spill response and cleanup, inspection schedule, inspection procedures and checklist for inspections conducted to ensure proper selection, implementation and maintenance of BMPs. E.11.e Inspection, Visual Monitoring and Remedial Action E.11.e The City will video inspect all storm drains within the right of way and easements for illict connections. x x x x x Public Works (b)Annual comprehensive "hotspot" inspections x x x x x Public Works Conduct annual Hotspot comprehensive inspections. The inspection should cover all stormwater BMPs and include any identified deficiencies. Document each inspection and any corrective actions taken to correct deficiencies. The records will be kept with the SWPPP. (c)Quarterly visual "hotspot" observation of stormwater & non-stormwater discharges. x x x x x Public Works Observe discharge locations from hotspot facilities. If a discharge is observed, identify any problems associated with pollutant sources or BMPs shall be remedied as soon as possible or before next storm event. Document each inspection and any corrective actions taken to correct deficiencies. The records will be kept with the SWPPP. (d)Inspection of non-hotspot facilities x x x Public Works Inspections of non-hotspot facilities are conducted once per permit term. E.11.f Storm Drain System Assessment and Prioritization 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 13 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.11.f Storm drain System Assessment & Prioritization x x x x Public Works Implement procedures to assess and prioritize storm drain system maintenance, including but not limited to, catch basins, pipe and pump infrastructure, above-ground conveyances, including receiving water bodies with the City's boundry and detention basins. E.11.f Assign high priority to catch basins. x x x x x Public Works Assign high priority to catch basins meeting any of the following Criteria: 1) accumulates a significant amount of sediment, trash, and/or debris; 2) collecting large volumes of runoff; 3) collecting runoff from areas that do not receive street sweeping; 4) collects runoff from drainage area with exposed or disturbed soil; 5) receive citizen complaints/reports. E.11.g Maintenance of storm drain system E.11.g Maintenance of storm dain system x x x x Public Works Begin maintenance of all high priority storm drain systems annually according to the procedures and priorities developed . (a)Inspect storm drain systems.x x x x Public Works Based on the priorities assigned E.11.f develop and implement a strategy to inspect strom drain systems. Inspect all high priority catch basins and systems annually. (c)Labeling catch basins.x x x x x Public Works Ensure that each catch basin in high foot traffic areas includes a legible storm drain marker. Catch basins that are reported missing markers by the public or City staff shall be recorded and relabeled within one month of inspection. (d)Maintain suface drainage structures. x x x Public Works High priority facilities, such as those with recurrent illegal dumping, shall be reviewed and maintained annually as needed. Non- priority facilities shall be reviewed as needed. Removal of trash and debris from high priority areas shall occur annually prior to the rainy season. (e)Dispose of waste materials x x x Public Works Develop and implement a procedure to dewater and dispose of materials extracted from catch basins. The procedure shall ensure that water removed during the catch basin cleaning process and waste material will not reenter the MS4. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 14 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.11.h Operations and Maintenance Activities (O&M) E.11.h Assessment of O&M activities x x x Public Works Assess O&M activites for potential to discharge pollutants in stormwater and inspect all O&M BMPs on a quarterly basis. (a)Develop and implement a program to assess O&M activities. x x x Public Works Develop and implement a program to assess O&M activities and develop applicable BMPs. Include the following O&M activities shall be included: 1) Road & parking lot maintenance including repair of sidewalks, potholes, curb and gutters; pavement marking, sealing and repaving; 2)Bridge maintenance including re- chipping, grinding, saw cutting and painting; 3) Right-of-way maintenance including mowing, herbicide & pesticide application, and planting vegetation; 4) Stormwater relevant City sponsored or sanctioned events; 5) Graffiti removal. (b)Identify all materials that could be discharged from each O&M activities. x x x Public Works Identify all materials that could be discharged from each O&M activities, and which materials contain pollutants. (Metals, chlorides, hydrocarbons, sediment, green waste, herbicide dried paint, and trash. (c)Develop and implement a set of BMPs that will reduce pollutants during O&M activities. x x x Public Works Develop and implement a set of BMPs that will reduce pollutants in stormwater and non- stormwater discharges during O&M activities using the CASQA Municipal Handbook or equivalent. (d)Evaluate BMPs quarterly.x x x Public Works Evaluate all BMPs implemented during O&M activities quarterly. E.11.i Incorportate Water Quality & Habitat Features in Flood Management facilities. E.11.i Develop and implement a process to incorportate water quality and habitat enhancement features. x x x Public Works Develop and implement a process to incorportate water quality and habitat enhancement features in the design of all new and rehabilitated flood mangement projects. E.11.j Landscape Design & Maintenance 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 15 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.11.j Landscape Design & Maintenance x Public Works Implement a landscape design and maintenance program to reduce the amount of water, pesticides, herbicides and fertilizers used during City operations and activities. (a)Evaluate Pesticide, Herbicide, Fertilizer (PHF) Use x Public Works Evaluate PHF used and application activities performed and edentify pollution prevention and source control opportunities. (b)Pesticide, Fertilizer Use BMPs x Public Works Implement practices that reduce the discharge of PHFs. At a minimum include items listed below. (b)(1)Implement educational activities for City applicators and distributors x x x x Public Works City staff that apply herbicides attend training annually. (b)(2)Implement landscape management measures that rely on non-chemical solutions. x Public Works Implement landscape management measures that rely on non-chemical solutions including: a) amend soils with compost to creat drought- resistant soils. b) Create soil microbial community through the use of compost, compost tea, or inoculation, c) Use native and/or climate appropriate plant to reduce the amount of water, PHFs used. d) Practice grass recycling on decorative turf landscape. e) Keep grass clipping and leaves away from waterways by mulching, composting, or landfilling. f) Prevent application of PHFs during irrigation or within 48 hours of a 50% chance of rainfall. g) Limit or replace herbicide and pesticide use. h) Prohibit application of PHFs as required by Dept. of Pesticide. i) Reduce mowing of grass to allow for greater pollutant removal. (2)(b)(3)Collect and properly dispose of PHFs. x x x x Public Works Collect and properly dispose of PHFs. (2)(b)(4)Minimize irrigation run-off by using evapotranspiration-based irrigation schedule and rain scensors. x x x x Public Works Minimize irrigation run-off by using evapotranspiration-based irrigation schedule and rain sensors. (2)(c)Record the types and amounts PHFs used. x x x x Public Works The City records the type and amounts of fertilizer, herbicides, and pesticides used. E.12 POST CONSTRUCTION STORWATER MANAGEMENT E.12.d Source Controls Measures The City is participating in the Central Coast Joint Effort for Post Construction Requirements which falls under E.12.k and is only 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 16 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.12.d Source Controls Measures x x x x Public Works Regulated projects are required to implement source control measures for the listed pollutant generating activities a - r of this section. E.12.j Planning & Development Review Process E.12.j The City will continue to enforce the current zoning ordinance with exisitng riparian buffer and wetland zones… E.12.j The City will develop a longterm watershed management plan. E.12.j Planning & Development Review x Public Works Revised codes E.12.k Post Construction Stormwater Management Requirements Based on Assessment and Maintenance of Watershed Processes. E.12.k Post Construction Storm Water Management Requirements Based on Assessment and Maintenance of Watershed Processes. x x x x x Public Works See BMPs listed below. x Public Works Apply interim criteria to new and redevelopment projects until September 6, 2013. x x x x x Public Works x Public Works x Public Works x x x Public Works Continue to reference LID manuals. E.12.k Implementation Strategy for LID and Hydromodification Control. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 17 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.12.k PC Watershed - Enforceable Mechanisms x x x x x Public Works New regulations are applied to applicable development and redevelopment projects E.12.k PC Watershed - Hydromodification Criteria Criteria is developed E.12.k PC Watershed - Applicability Thresholds Thresholds have been established E.13 WATER QUALITY MONITORING E.13 Water Quality Monitoring E.13(c)Water Quality Monitoring - 303(d) monitoring x Public Works The City's stormwater system discharges to the Pacific Ocean which is listed on the 303(d) list as being impaired by Indicator Bacteria with an unknown source. The City shall meet with the RWQCB within the first year to assess whether monitoring is necessary and if so, determine the monitoring study design and implementation schedule. The City may choose to participate in a regional monitoring program to create a more comprehensive picture of water quality conditions within the watershed. The regional program must be reveiwed and approved by the Executive Officer of the Regional Board. E.14 PROGRAM EFFECTIVENESS ASSESSMENT AND IMPROVEMENT E.14.a Program Effectiveness Assessment and Improvement Plan E.14.a Program Effectiveness Assessment and Improvement Plan (PEAIP) x x x x Public Works Develop and implement a PEAIP that tracks annual and long-term effectiveness of the storm water program. The plan shall identify the strategy used to gauge the effectiveness of prioritized BMPs and program implementation as a whole. Prioritized BMPs include those based on pollutants of concern. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 18 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (a)The Program Effectiveness Assessment and Improvement Plan shall include certain elements. x x x x Public Works The PEAIP shall include: 1) Overall goal including pollutants of concern and prioritized BMPs. 2) Documentation of the level of implementation of the program elements. 3) Identification and targeting of target audiences. 4) Assessment of BMP performance at achieving outcome levels. 5) Assessment of pollutant source reductions achieved by individual BMPS. 6) Quantification of pollutant loads and pollutant load reductions achieved by the program as a whole. 7) Discharge quality, where available, inluding analysis of the data. 8) Receiving water quality data, including analysis of the data. 9) Identification of long-term effectiveness assessment, to be implemented beyond the permit term. (b)The PEAIP shall assess BMP and program effectiveness in terms of outcome levels. x x x x Public Works The PEAIP shall assess BMP and program effectiveness in terms of outcome levels: 1) Stormwater program activities. 2)Awareness. 3) Behavior. 4) Pollutant load reductions 5) Discharge Quality. 6) Receiving water conditions. (c)The PEAIP shall identify assessment methods for privately owned BMPs x x x x Public Works The PEAIP shall identify assessment methods for privately owned BMPs (d)The PEAIP shall Identify assessment methods used to quantitatively assess BMP performance at reducing pollutant loads: x x x x Public Works The PEAIP shall Identify assessment methods used to quantitatively assess BMP performance at reducing pollutant loads: 1) Direct quantitative measurement of pollutant load removal. 2) Science-based estimates of pollutant load removal for BMPs where direct measurement of pollutant removal is overly challenging. 3) Direct quantitative measurement of behaviors that serve as proxies of pollutant removal or reduction. 4) Visual comparison. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 19 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal (e)The PEAIP shall ask and answer the following management questions for prioritized BMPs for which answers can be based on quantitative data. x x x x Public Works The PEAIP shall ask and answer the following management questions for prioritized BMPs for which answers to management questions can be based on quantitative data. 1) Were prioritized BMPs implemented in accordance with the permit requirements? Develop quantitative data using confirmation and tabulation. 2) To what extent did prioritized BMPs change the target audience's behavior? Use: a) Surveys or interviews to dicern knowledge, attitudes, awareness, behavior of specific population, etc. b) Interviews of site personnel to dicern awareness and behavior. c) Inspections or site visits to observe or asess a practice. 3) To what extent did prioritized BMPs reduce pollutant loads from their sources to the storm drain system. (f)The PEAIP shall include water quality monitoring data. x x x x The PEAIP shall include water quality monitoring data where available to answer the following long-term managemnt questions, effectiveness of BMPs and overall stormwater program will be assessed in future permit terms. E.14.b StormWater Program Modifications E.14.b StormWater Program Modifications x Public Works Identify and summerize BMP and/or program modifications identified in priority program areas. E.15 TOTAL MAXIMUM DAILY LOADS COMPLIANCE REQUIREMENTS The City does not currently have any TMDLs. E.15.a Comply with all approved TMDLs (Attachment G) E.15.b Wasteload allocations are incorporated herein by reference as enforceable parts of this Order E.15.c Regional Board reviews TMDLs within one year of effective date and may propose modifications to requirements E.15.d Report status of implementation via SMARTS 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 20 of 21 City of Pismo Beach Guidance Document for Municipal Stormwater Permit 2013-2018 Section Permit Element 1 2 3 4 5 Responsible Dept New BMP Measurable Goal E.15.e Comply with Clean Water Act Sections 303d, 306B, and 314 E.16 ANNUAL REPORTING PROGRAM E.16.a Annual reporting on SMARTS x x x x x Public Works The State Water Board SMARTS shall be used to submit a summary of the past year activities for each program element and certify compliance with all requirements of the Permit. E.16.b The City shall complete and retain all annual report information on the previous year beginning July 1, and ending June 30. x x x x x Public Works The City shall complete and retain all annual report information on the previous year beginning July 1, and ending June 30. All documentation to support the annual report shall be retained and be available for review during normal business hours. E.16.c Submit a detailed written online annual report or in-person presentation of the annual report when requested. x x x x x Public Works Submit a detailed written online annual report or in-person presentation of the annual report when requested. The detailed annual report must clearly refer to the permit requirements and describe in quantifiable terms, the status of activities undertaken to comply with each requirement. E.16.d Permittees involved in regional programs may coordinate with the members to identify reporting responsibility. One report to be submitted. x x x x x Public Works Permittees involved in regional programs may coordinate with the members to identify reporting responsibility. The one report to be submitted must include a summary of requirements of the permit for each of the MS4s in the regional program. 8/29/2013 :10:10 AM Guidance Document 2013-2018 for WEBPAGE PUBLISH (AUG 2013) : Guidance Doc Public Page 21 of 21