Laserfiche WebLink
Planning Commission Agenda January 22, 2019 <br /> 5. ITEMS PULLED FROM CONSENT CALENDAR <br /> 6. PUBLIC HEARING AGENDA <br /> Item 6.A: 2121 PRICE STREET; APPLICANT: ADAM MARQUIS, IWF PISMO <br /> TIDES, L.P.; PROJECT NO. P15-000083 <br /> Coastal Development Permit, Architectural Review Permit and Sign Permit for <br /> the demolition of an existing 23-room hotel and 3 guest cottages, demolition <br /> of an existing private beach access stairway, and construction of a new 52,700 <br /> square foot hotel facility consisting of 97 rooms and related amenities including <br /> an outdoor pool, spa, restaurant, bar, outdoor space, new beach stairway, and <br /> coastal access pathway, and continue to a date uncertain with direction to <br /> applicant for changes to the project. <br /> Recommendation: Review and discuss Coastal Development Permit, <br /> Architectural Review Permit and Sign Permit for the demolition of an existing <br /> 23-room hotel and 3 guest cottages, demolition of an existing private beach <br /> access stairway, and construction of a new 52,700 square foot hotel facility <br /> consisting of 97 rooms and related amenities including an outdoor pool, spa, <br /> restaurant, bar, outdoor space, new beach stairway, and coastal access <br /> pathway, and Continue to a Date Uncertain with direction to Applicant for <br /> changes to the project, including to revise plans and/or provide additional <br /> information in regards to the following items: <br /> • Provide continuous bluff in regard to bluff setback and open space <br /> easements. <br /> • Revise plans to relocate buildings or reduce room counts, as needed, <br /> in regards to 30% slope and bluff setbacks per direction of the Planning <br /> Commission <br /> • Consider alternative lodging options for these areas such as small <br /> Airstream-type trailers in lieu of grading on slopes over 30% <br /> • Provide "x" number of public access parking spaces onsite <br /> • Provide second floor setbacks for buildings adjacent to coastal access <br /> pathway <br /> • Responses to Building Division comments, and revisions to plans as <br /> needed. <br /> Planner: Michael Gruver, Associate Planner <br /> 7. BUSINESS ITEMS <br /> 8. COMMISSIONER COMMENTS <br /> 9. DIRECTOR COMMENTS <br /> 10. ADJOURNMENT <br /> Page 2 of 3 <br />